At the end of the third month of period 1, the second period began with crown preparation of the two distal abutments on both sides of the edentulous areas. Patients received a surveyed bridge with two extra-coronal attachments and a new RPD was constructed following standardized clinical procedures. The ARRPD was constructed and picked up intraorally using cold-curing resin (Figure 2). The patients were instructed how to use their dentures and the denture hygiene method was illustrated. Again, the participants were followed-up after 1, 2, and 3 months.
Attachment retained RPD, a, frontal intraoral view, b and c sides view.
Do you have any questions about this protocol?
Post your question to gather feedback from the community. We will also invite the authors of this article to respond.